top of page
< Back

Peterborough Solar and BESS

Birdwood Energy

Birdwood Energy

4.98 MVA

Services: 
Project Status: 

Birdwood Energy

In development

Client: 
Size: 

The DNSP was SAPN. They required what they called a mini-GPS. It is basically the same as a registered generator (NER chapter 5) connection study, with some reduction in scope.

©2023 by Dynamica

bottom of page