Clients and projects
We are proud to have worked with these companies and projects:

Clements Gap
57 MW wind
PSCAD model development and validation

Lincoln Gap Stage 1
126 MW wind
From connection inquiry to full generation.
Part of this was done while employed by Suzlon

Murra Warra Stage 1
225 MW wind
Support of the project and models post construction

Natimuk
4.95 MVA solar
Static connection studies in SINCAL.

Crowlands
80 MW wind
Frequency response and model tuning.
FCAS testing

Lincoln Gap Stage 2
86.4 MW wind
Connection studies, and 5.3.9 process.
This work was in a collaboration with Vestas

Snowtown Stage 1
100 MW wind
PSCAD model development and validation.
This project was a collaboration with Suzlon

Newstead
4.95 MVA BESS/PV
Dynamic studies and PSSE / PSCAD provision.
MAT and benchmarking.