Projects

Murra Wurra Wind Farm Stage 1

RES, Squadron Energy

Wind (full converter)

226 MW

Generating

– R2 testing
– Generator compliance program
– Fixed non-compliant power ramps

Crowlands wind farm

Pacific Hydro

Wind

80 MW

Generating

– Model editing
– R2 testing

LaTrobe University Solar and BESS

Enhar, NGE Electrical

Solar + BESS

4.95 MVA

Generating

Full grid connection service

Cullerin Range Wind Farm

EDL

Wind

30 MW

Generating

Islanding studies for connection application

Newstead Solar Farm

Flow Energy

Solar + BESS

4.95 MVA

Generating

Full grid connection service

Lincoln Gap Wind Farm Stage 1

Nexif Energy, Ratch SA

Wind (full converter)

126 MW

Generating

– R2 testing
– Fixed non-compliant power ramps
– Power quality test & remediation

Peterborough Solar and BESS

Birdwood Energy

BESS retrofit

4.98 MVA

In development

– Full grid connection service
– GPS studies

Mobilong Solar Farm

Birdwood Energy

Solar + BESS

4.95 MVA

Generating

Connection application studies

ACM biogas plant

Australian Consolidated Milk

Biogas / synchronous machine

1.5 MW

Generating

– Full connection service
– Model writing