top of page

Murra Wurra Wind Farm Stage 1
RES, Squadron Energy
RES, Squadron Energy
226 MW
Services:
Project Status:
RES, Squadron Energy
Generating
Client:
Size:
We provided a grid connection service for this project after the demise of the OEM (Senvion). We helped it to successfully complete the R2 process, to reach full generation. This included hold point testing, R2 model validation, power quality analysis. Later we provided a Generator Compliance Program (GCP) plan.
We also investigated and corrected a non-compliance with the power dispatch instructions.

bottom of page