top of page
< Back

Crowlands wind farm

Pacific Hydro

Pacific Hydro

80 MW

Services: 
Project Status: 

Pacific Hydro

Generating

Client: 
Size: 

We edited to PSSE and PSCAD model to allow it to model a control dead band. Then we performed R2 frequency response testing and validated the model.

©2023 by Dynamica

bottom of page